What a CMM report tells you
How to read the report that comes with every lot.
Aerospace and automotive work · First-article samples in 10 working days
SF 214, SIDCO Industrial Estate, Kurichi, Coimbatore 641021
Mon–Sat · 8.30 am – 6 pm · two shifts
Journal
Guides, care tips and stories from behind the counter.

Five small changes to a drawing that cut cost and lead time.
Read the postHow to read the report that comes with every lot.
Five-axis machining costs more per hour and can still be cheaper per part.
Strength, weight, machinability and cost per kilo: how the common grades compare for a milled housing.
Material, programming, set-up, cycle time, inspection and finishing: the six lines behind every price we send.
What to include, how long a quote takes, and what happens between your drawing and the first sample on your desk.
Bar feeders, guide bushes and a part every 40 seconds: what our Swiss-type section does between 6 am and 2 pm.
From textile mills and pumps to aerospace parts: why so many machine shops grew up along the Noyyal river.
Each extra decimal place on a drawing costs time and money. How to tell which dimensions really need ±0.01 mm.
Our holiday calendar, how supplier closures ripple through lead times and when to place orders for November and January.
Send it with quantities. Our engineers reply within 48 hours, under NDA if you need one.