Lookbook
Noyyal Precision Works in pictures
Each lot is checked on CMM and the report travels with the parts. Ask for a sample report with your quote.













Two shifts, 42 machines and a cool room for measuring.
Noyyal began in 2003 with two lathes in a Kurichi shed, turning pump shafts for neighbours. Today 140 people run 42 CNC machines across two shifts, and every lot passes through a temperature-controlled inspection room before it is packed.
Read our storyHave a drawing ready?
Send it with quantities. Our engineers reply within 48 hours, under NDA if you need one.