What happens on erection day
Cranes, bolts, plumb lines and the order in which a shed goes up.
Taking enquiries for sheds and warehouses across Andhra Pradesh and Odisha
Plot 27, Autonagar, Gajuwaka, Visakhapatnam 530012
Mon–Sat · 8.30 am – 6 pm
Why surface preparation matters more than the paint you choose.

In Visakhapatnam, salt in the air reaches every steel structure within a few kilometres of the coast. Untreated steel starts to rust within weeks, and a poorly painted shed can need repainting in three years.
The most important step is the one you never see: surface preparation. We shot-blast every member to remove mill scale and rust down to bare metal, which gives the primer a rough surface to grip. Paint applied over mill scale looks fine for a year and then peels off in sheets.
After blasting, we apply a zinc-rich or epoxy primer within hours, before the steel can flash-rust, followed by an intermediate coat and a polyurethane finish for structures exposed to sun and salt. We measure dry film thickness at several points on each piece.
For platforms and handrails right on the coast, hot-dip galvanising is often worth the extra cost. Tell us how far your site is from the sea, and we will suggest a paint system and show you its expected life.
Keep reading
Cranes, bolts, plumb lines and the order in which a shed goes up.
Steel weight, roofing, span and height: how a ₹1,800 to ₹2,600 a sq ft estimate is built up for a plain warehouse.
Cutting, fitting, welding, blasting and painting: how a built-up rafter is made in our yard before it goes to site.