PEB or conventional steel: which suits your shed
Tapered frames save steel; rolled sections are easier to change later.
Taking enquiries for sheds and warehouses across Andhra Pradesh and Odisha
Plot 27, Autonagar, Gajuwaka, Visakhapatnam 530012
Mon–Sat · 8.30 am – 6 pm

Steel structures · Visakhapatnam · since 2006
Pre-engineered buildings, structural steel and heavy fabrication for factories, warehouses and ports, from design to the last bolt on site.
Products
Every job is priced to drawing. Send a layout or a sketch.
Most asked
New


The yard
Ukku started in 2006 with four welders building trusses for local mills. Today 210 people design, cut, weld, blast and paint in our Autonagar yard, and our own erection crews put the steel up on site with cranes we own.
A layout, a sketch or your consultant’s drawings.
Our engineers size the steel and quote in 5 days.
Made in our yard, erected by our own crew.

Our quality team measures, marks and photographs each piece, so the site crew finds the right part in the right place.
Talk to our teamReviews
Sample reviews, written for this demo. Real customer reviews replace them on your store.
Our 3,600 sq m warehouse went up in eleven weeks, and the roof has been dry through two monsoons.
They cut and fabricated 40 t of platform steel for our plant shutdown, on time and marked so our crew could fit it fast.
The quote broke the job down by weight and by item. No surprises in the final bill.
By the weight of steel, the roofing area and the erection work. A plain warehouse shed usually works out to ₹1,800–2,600 a sq ft including roofing, depending on span and height.
Yes. Our engineers design the structure for your loads and site, and issue drawings for approval. We can also work to your consultant’s design.
We provide the anchor bolt layout and loads. Your civil contractor builds the foundations, and we check the bolts before erection.
A 2,000 sq m shed takes about 10–12 weeks from approved drawings to handover. Fabrication-only jobs are faster.
Journal
Tapered frames save steel; rolled sections are easier to change later.
Why surface preparation matters more than the paint you choose.
Cranes, bolts, plumb lines and the order in which a shed goes up.
Share the size, site and use. Our engineer will call you within one working day.