Suncrest theme · Rooftop solar · demo storeUse this theme All 150 themes

Free roof survey across Jaipur · We file the subsidy and net-metering paperwork for you

Rooftop solar · Jaipur since 2015

Jaipur sun on your roof, and a smaller bill every month.

On-grid and hybrid rooftop systems for homes, housing societies and businesses, surveyed, installed and maintained by our own team.

Products

Systems we install

Every system is sized to your bill and roof. Quotes within 2 days of the survey.

5 kW home system

5 kW home system

10 panels · net meter · ~20 units a day

Price on request

All products

Our crew

Engineers on the roof, not just salespeople at the door.

Vikram, an electrical engineer, started Kesar in 2015 with one crew and a pickup truck. Today four crews install across Jaipur and Ajmer, and the person who surveys your roof also signs off the installation.

1,850
rooftops installed
14 MW
installed across Rajasthan
30 days
from survey to switch-on
Read our story
01

Survey

An engineer checks your roof, shade and bills.

02

Quote

System size, savings and payback within 2 days.

03

Install

Paperwork, installation and net meter handled by us.

See a working system before you decide.

Visit one of our installations in Malviya Nagar or Vaishali Nagar on a Saturday and talk to the owner about their bills.

Talk to our team

Reviews

What customers say

Sample reviews, written for this demo. Real customer reviews replace them on your store.

Our bill went from ₹4,800 to under ₹600 in summer. They handled every form with the discom.
Rajendra S. · Malviya Nagar, Jaipur
The engineer moved the panels to avoid our neighbour’s water tank shadow. Nobody else noticed it.
Neha A. · Vaishali Nagar
Installed 40 kW on our school roof during the summer holidays. Monitoring shows every day’s output.
Mohd. Farooq · Ajmer

Questions

Before you enquire

Answers to what customers ask us most. More on the questions page.

How much roof space do I need?

About 80 to 100 sq ft per kW without shade. A 3 kW system needs roughly 300 sq ft, and the raised structure leaves the area below usable.

Will I get the government subsidy?

Homes with their own electricity connection are usually eligible for the central rooftop subsidy. We check eligibility at the survey and file the application for you.

How long does the whole process take?

Survey within 3 days, quote within 2 more. Installation takes 1–2 days, and net-meter approval from the discom usually takes 3 to 6 weeks.

Does solar work during a power cut?

An on-grid system shuts off during a cut for the safety of line workers. For backup, you need a hybrid inverter and battery, which we can add later.

Journal

From Kesar Rooftop Solar

All posts

How much could your roof save?

Send a photo of your last electricity bill. We reply with an estimate in a day.