How to size a home solar system
Start from your bill, not your roof; then check the roof can take it.
Free roof survey across Jaipur · We file the subsidy and net-metering paperwork for you
22 Gopalpura Bypass, Gopalpura, Jaipur 302018
Mon–Sat · 9.30 am – 6.30 pm

Rooftop solar · Jaipur since 2015
On-grid and hybrid rooftop systems for homes, housing societies and businesses, surveyed, installed and maintained by our own team.
Products
Every system is sized to your bill and roof. Quotes within 2 days of the survey.
Most chosen
New


Our crew
Vikram, an electrical engineer, started Kesar in 2015 with one crew and a pickup truck. Today four crews install across Jaipur and Ajmer, and the person who surveys your roof also signs off the installation.
An engineer checks your roof, shade and bills.
System size, savings and payback within 2 days.
Paperwork, installation and net meter handled by us.

Visit one of our installations in Malviya Nagar or Vaishali Nagar on a Saturday and talk to the owner about their bills.
Talk to our teamReviews
Sample reviews, written for this demo. Real customer reviews replace them on your store.
Our bill went from ₹4,800 to under ₹600 in summer. They handled every form with the discom.
The engineer moved the panels to avoid our neighbour’s water tank shadow. Nobody else noticed it.
Installed 40 kW on our school roof during the summer holidays. Monitoring shows every day’s output.
About 80 to 100 sq ft per kW without shade. A 3 kW system needs roughly 300 sq ft, and the raised structure leaves the area below usable.
Homes with their own electricity connection are usually eligible for the central rooftop subsidy. We check eligibility at the survey and file the application for you.
Survey within 3 days, quote within 2 more. Installation takes 1–2 days, and net-meter approval from the discom usually takes 3 to 6 weeks.
An on-grid system shuts off during a cut for the safety of line workers. For backup, you need a hybrid inverter and battery, which we can add later.
Journal
Start from your bill, not your roof; then check the roof can take it.
Rajasthan dust can cut output by 15% in a month.
Most city homes need on-grid; hybrid makes sense where power cuts are long.
Send a photo of your last electricity bill. We reply with an estimate in a day.