IE2 or IE3: what the efficiency class means
What the labels mean in rupees for a motor that runs all day.
IE3 motors from stock in 0.37–30 kW · Rewinding with a 6-month warranty
J-214, MIDC Bhosari, Pune 411026
Mon–Sat · 8.30 am – 7 pm · breakdown desk 24 hours
Electric motors and drives · Pune · since 1989
IE2 and IE3 induction motors, geared and brake motors, and a rewinding shop that repairs any make up to 315 kW.


Products
Prices depend on rating, frame and mounting. Quotes within a working day.
Bestseller
New


Our works
Bhramari began in 1989 as a rewinding shop for plants in Pimpri and Chinchwad. We built our first motor in 1996. Today 180 people stamp, wind, impregnate, machine and assemble motors here, and every one runs on the test bench before it is boxed.
Rating, speed, mounting and load.
An engineer checks and replies in a working day.
Delivered with our bench readings; site support on call.

Ask for a free motor survey. We log your old motors’ load and suggest which ones to replace with IE3 or fit with a drive.
Talk to our teamReviews
Sample reviews, written for this demo. Real customer reviews replace them on your store.
Our 90 kW extruder motor was rewound and back on the floor in four days. It runs cooler than before.
We replaced 42 old motors with their high-efficiency range after the survey. The power bill dropped by about 11%.
Brake motors for our hoists, sized right the first time and delivered with bench readings.
IE2 and IE3 foot-mounted motors from 0.37 to 30 kW, 2 and 4 pole. Larger ratings and flange motors are made to order in 2–4 weeks.
Yes, any make of AC motor up to 315 kW, and DC motors up to 75 kW. We send a quote with photos after opening the motor.
Small motors take 3–5 days, and motors above 75 kW about 7–10 days. Urgent breakdowns can be worked in shifts.
For motors running more than 4,000 hours a year, usually yes. The price difference is often recovered in power savings within 1–2 years.
Journal
What the labels mean in rupees for a motor that runs all day.
Five questions to ask before you send a burnt motor back to work.
Throttling a valve wastes power. Slowing the motor does not.
Our pickup van covers Pune, Chakan and Talegaon the same day for urgent breakdowns.